There is no item in your cart
- 0 Like
- 0 Comments
- By Andy Smith
- UK Construction News
Hammersmith’s iron bridge has been closed after the recent heatwave increased cracks and raised the risk of the suspension system failing. The 133-year-old bridge over the River Thames was completely shut at 5pm on Thursday (13 August). A sudden deterioration in key parts of the…
The post Hammersmith Bridge closed by heatwave cracks appeared first on Construction News.