There is no item in your cart
- 0 Like
- 0 Comments
- By Andy Smith
- UK Construction News
The cost of ISG’s contract on the redevelopment of London Waterloo station’s old Eurostar terminal for retail use has risen by £16m after it was discovered that extra work was needed on the job. ISG won a £41.7m contract with London Continental Railways (LCR), which…
The post Client to reimburse ISG as cost on Waterloo job rises appeared first on Construction News.