There is no item in your cart
After closing the public highway, and forming a safe pedestrian footpath, we installed 2 heavy duty jack support systems to hold the rail bridge.
This enabled us to break out, and replace the existing concrete support pads with minimal disruption to the Rail Infrastructure.