Fleet

Awesome Image

Project Information

Fleet

As part of a scheme driven by the Local Authority we were contracted to increase the widths to 2 areas of the Platforms in order to install new Cycle Storage Facilities, to one side the existing retaining walls were demolished and a new reinforced concrete cantilever slab with retaining wall was constructed.
The existing fence was re fabricated to suit and additional drainage installed.
A new entrance ramp was formed to enable direct access to the new storage areas.
Works are continuing at present with the formation of a suspended concrete slab for the introduction of a new cycle hub and alterations to the access road to form a safe route for cyclists.